ce24-07r2
https://web.aacei.org/docs/default-source/ce/2024/ce24-07r2.pdf?sfvrsn=5fc7278e_1
The Hybrid Earned Va l u e Analysis — A Proxy for the Measured Mile Project Contingency, The Hybrid Earned Va l u e Analysis — A Proxy for the Measured Mile RYAN N. WITTERS AND RUSSELL H, e the recognized technical authority in cost and schedule management for programs, projects, Engineering (ISSN: 0274-9696/24) is published digitally on a bi-monthly production schedule by AACE, Earned Value Analysis—A Proxy for the Measured Mile, by Ryan N. Witters and Russell H. Wodiska, EVP
23767
https://web.aacei.org/docs/default-source/vl-papers/23767.pdf?sfvrsn=6328b89a_1
. The authors have many years of experience in planning and scheduling as well as forensic analysis. They try to use lessons learned from the failures examined in forensic analysis to improve, to Schedule Planning Session & Time ..................................................................19 Mistake #2 – Not Utilizing the Team’s Plan & Schedule to Manage the Project’s Execution, consent from AACE® International Exhibits The schedule in Figure 1, below, is an example
23759
https://web.aacei.org/docs/default-source/vl-papers/23759.pdf?sfvrsn=87cc70a7_1
, and this is provided by a halfstep progress-only analysis of the update using a forensic schedule analysis, (CPA) from the AACE Recommended Practice No. 29R-03, “Forensic Schedule Analysis”. [5, , Recommended Practice No. 29R-03, Forensic Schedule Analysis, Morgantown, WV: AACE International, Latest, encompasses the planning and for project control encompasses the monitoring of the project scope, schedule, a project's life cycle. It emphatically asserts that all functions, scope, schedule, risk
10.3 Change Management
https://web.aacei.org/resources/tcm/10.3.shtml
increases with their number and extent (i.e., analysis paralysis), and change is a known, or baseline project control plan (e.g., schedule, budget, resource plans, etc.). A deviation, of actual project performance from that which was planned. Variance analysis is a method, . However, if the issue cannot be disposed of without further analysis of its nature, , and variances for which disposition is not immediate, further definition and analysis
ce25-03
https://web.aacei.org/docs/default-source/ce/2025/ce25-03.pdf?sfvrsn=69a452c2_1
of schedule risk analysis for the past 8 years. The focus of this work shifted around 4 years ago from, with schedule risk analysis for many years, and we have found MARCH/APRIL 2025 6 the AACE, ALSO: Practical Implementation of AI-Based Risk Analysis on Construction Megaprojects Correcting, JAMES G. ZACK, JR. CFCC FAACE HON.LIFE 20 Practical Implementation of AI-BasedRisk Analysis, e the recognized technical authority in cost and schedule management for programs, projects
ce25-09
https://web.aacei.org/docs/default-source/ce/2025/ce25-09.pdf?sfvrsn=e457767d_9
/OCTOBER 2025 9 1. Introduction The authors have experience in both scheduling and forensic analysis and try to use lessons learned from the failures examined in forensic analysis to improve scheduling, on the Usage of Data Analytics and Machine Learning to Measure Schedule Health The To p Te n A p, n i n g to Measure Schedule Health JOSEPH LOZADA; KAYLYN MICKELSEN, PSP; HAMID SAYED, Recommended Practice 133R-23: Using Decision Analysis Methodologies to Enhance Decision Quality
6.2 Asset Change Management
https://web.aacei.org/resources/tcm/6.2.shtml
any information that could impact safety, quality, schedule, cost, profit, and analysis and asset planning processes (Section 3.1 and 3.2). Figure 6.2-1 Process, starts with planning. Initial planning starts with requirements elicitation and analysis (Section, , if the issue cannot be disposed of without further analysis of its nature and consequences, definition and analysis is required before corrective actions can be taken. 6.2.2.3 Analyze
23581
https://web.aacei.org/docs/default-source/vl-papers/23581.pdf?sfvrsn=3094cdba_1
of disruptions, including schedule updates, monthly, weekly, and daily progress reports, resource histograms, 2.2. Measured Mile Analysis (MMA) ......................................................................................................................4 2.3. Improved Measured Mile Analysis, 2.4. Advanced Measured Mile Analysis, Evidences Analysis
ce24-09
https://web.aacei.org/docs/default-source/ce/2024/ce24-09.pdf?sfvrsn=b49ff499_1
other AACE International technical areas were in performing forensic analysis of schedules, costs and schedule duration. Using the model, a simulation is performed using a Monte Carlo analysis, t Management ® OUR VISION - To b e the recognized technical authority in cost and schedule, -monthly production schedule by AACE International, Inc, 726 Park Avenue #180, Fairmont, WV 26554 USA, and schedule records and supporting documentation are key in the recovery of changes and claims
23691
https://web.aacei.org/docs/default-source/vl-papers/23691.pdf?sfvrsn=dff3f0_1
schedule updates allow for the utilization of schedule analysis to demonstrate causation, International, Latest revision. 9. AACE International, Recommended Practice No. 29R-03, Forensic Schedule, Causation Analysis: Establishing a Persuasive Causal Link, claims require detailed analysis and a nuanced approach to demonstrate a clear causal link, the common disruption analysis methodologies, identifies key challenges in establishing cause