Technical Program Schedule

(For detailed information about each session, refer to the Abstracts pages.)

Monday (June 17)

NOTE: Program Subject to Change

Room 1 Room 2 Room 3 Room 4 Room 5 Room 6 Room 7 Room 8 Room 9
MON 7:00-8:00 Breakfast (Exhibit Hall)
MON 8:00-9:30 Monday Keynote - Meagan Johnson Sponsored by InEight
MON 9:30-10:00 Coffee Break (Exhibit Hall)
MON 10:15-11:15 DEV-3045 CSC-3107 TCM-3245 EST-3201 PS-3120 OWN-3187 RISK-3037 CDR-3110 PM-3134
  Problem Analysis using Statistical Safeguards The Power of Projections: Innovative Schedule Forecasting Techniques Cost Engineering as a Driver of Capital Efficiency Predictive Analytics Can Improve Cost Estimating for Smart City Projects Integrating the Last Planner System® into the Critical Path Method Schedule Los Angeles Metro Fast-Track Capital Program Management Best Practices Combining Parametric and CPM-based Integrated Cost-Schedule Risk Analysis Concurrency and Pacing -  Does Intent Matter? Aerial Data Collection Accuracy and Insights to Infrastructure Decisions
  Gregory J. Whiteside, PE CCP; James D. Whiteside, II FAACE Ken Carrico; Eric Dembert, PE; Mike Hollowell; Jeff Johannsen; Jesse Lund, CCP PSP Anthony M. Bazzini; Robert F. Addotta Anthony A. DeMarco; Richard Mabe; Grady Noll Jonathan R. Hunt; Hannah E. Schumacher, PSP Julie K. Owen, CCP PSP FAACE; Sean A. VonFeldt Colin H. Cropley Josh Chittick; John C. Livengood, Esq. CCP CFCC PSP FAACE Blaine Horner; Ryan Mextorf; Kyle Schroeder; Shanna Hawley; Timothy Bail; Travis Featherby; Vinay Nair, PE
  Advanced Advanced Basic Intermediate   Intermediate     Basic
  Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD
MON 11:30-12:30 DEV-3224 TCM-3305 CSC-3132 EST-3184 PS-3255 PS-3181 RISK-3078 CDR-3214 PM-3105
  14 Key Areas to Improving Your Cost and Schedule Team's Performance (Panel Discussion) Project Controls in an OS 2.0 Environment The Clear Flow Matrix: An Effective Production Control Technique Using Crew Level Planning Estimate Validation and Bias Assessment: Ratio-to-Driver Method The Benefits of the Linear Scheduling Method for Reviewing Non-Linear Projects Who Owns the Dates of the Procurement Package Status Report? - Practical Application on Mega Project Cost and Schedule Risks Interact in Megaprojects Understanding and Applying the Elements of Constructive Acceleration Program Management Lessons Learned:  Alaskan Way Viaduct Replacement Program
  Stephen M. Beck, CCP Stephen L. Cabano; Stephen Mulva; Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life; Martin R. Darley, CCP Augusto Tiezzi; David Lott, PE; Wayne Lott; Dr. John D. Borcherding; Dr. William J. O'Brien John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life Stanko Pavlovic, P.Eng. PSP Lise Bouchard, CCP; Stefan M. Sonnenberg, PSP Dr. David T. Hulett, FAACE; Waylon T. Whitehead Cory R. Milburn, CFCC PSP; Brian J. Furniss, PE CFCC PSP David Sowers, PE; Harry W. Jarnagan, PE CCP FAACE Hon. Life; Brian C, Smith, CCP
Intermediate 0 Intermediate Intermediate Intermediate     Intermediate Basic
Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD
MON 12:30-2:00 Lunch (Exhibit Hall)
MON 2:15-3:15 EVM-3271 SK-3103 IT-3064 EST-3290 PS-3293 PS-3101 RISK-3159 CDR-3162 PM-3062
  Emergent EVM Techniques for Construction Schedule Performance Measurement and Control (Presentation Only) Intelligent Forecasting Using Earned Value Management - Extensions of Tradition S-Curve Analytics Standard Cost Management: From Spreadsheets to Automation A Comparison of U.S. Army Corps of Engineers Cost Estimating Policies Lessons Learned on Integrating Linear Schedule with the CPM Schedule Schedule Trend Control Charts in Excel Risk Identification and Assessment of Oil and Gas Facility Engineering Identifying the As‐Built Critical Path Using Recommended Practice 29R-03 Pre-qualifying Contractors for Today’s Project Delivery Needs
  Farah S. Demachkieh; Dr. Mohamed-Asem Abdul-Malak Michael Bensussen Ashley Garza; Sharla Gill Tracy Trippe Leeser, PE Kristy Kastner, PSP Bryan Eaton, CCP PSP Li Huaiyin; Dang Xuebo; Zhang Lei; Wang Jiayin Andrew Avalon, PE PSP; Christopher W. Carson, CEP DRMP PSP FAACE; John J. Ciccarelli, PE CCP PSP FAACE; Kenji P. Hoshino, CFCC PSP; John C. Livengood, Esq. CCP CFCC PSP FAACE; Mark C. Sanders, PE CCP CFCC PSP H. Lance Stephenson, CCP FAACE
        Basic     Basic   Intermediate
  Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD
MON 3:15-3:45 Coffee Break (Exhibit Hall)
MON 4:00-5:00 EVM-3272 TCM-3301 OWN-3109 EST-3252 PS-3086 OWN-3196 RISK-3175 COM-3164 PM-3124
  Comparative Analyses of Construction Cash Flow Predictions Using Empirical S-Curves (Workshop) A Practical Guide to Project Controls Development - Part 2 of 3 How Can Nuclear Construction Costs Be Reduced? Five Practical Tips to Improve Nuclear Project Economics Cost Estimating in Hyperinflation Economies (Panel Discussion) The Great Debate: Owners vs. Contractors - Are We Done Yet? The Role Owner Project Control Plays in Contract Administration Actions for Improving Risk Management Culture Claims and Dispute Resolution Subcommittee Meeting Disruption Quantification in Small and Medium EPC Projects:  A System Dynamics Model
  Farah S. Demachkieh; Dr. Mohamed-Asem Abdul-Malak Dave Kyle, CCP CEP Arnaldo M. Angelini, PE; Apostolos (Tolis) Chatzisymeon; Sean T. Regan, CCP CEP EVP PSP FAACE Francis Lira Vargas Jeffrey Milo, PSP; John P. Orr, PSP Christopher F. Michalak; Paul G. Williams Aaron P. Ingebritson, PE John J. Ciccarelli, PE CCP PSP FAACE Michael Mac Guinness
        Intermediate Intermediate   Basic   Intermediate
  Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: Not Applicable Host: TBD