A1: Project Controls from the Owner's Perspective

Monday - Wednesday, June 22-24, 2020 (3 DAYS)
11:00 AM - 3:30 PM EDT (US)

1.1 CEUs

$500 member / $600 non-member

This is a live, instructor-led seminar being held in conjunction with AACE's 2020* Virtual Conference and Expo. The course will run 11:00 AM - 3:25 PM EDT each day with a 40 minute break for lunch at 12:10 PM EDT.
Steve CabanoInstructor: Stephen Cabano 

Steve Cabano is President of Pathfinder, LLC, a project management consulting firm specializing in the planning, development and execution of domestic and international capital plant construction projects. With more than 25+ years of project engineering and project management experience in the industrial and commercial facilities industry, he has provided cost, scheduling, procurement, and similar project related services for owner and government clients in the Petroleum, Petrochemical, Chemical, Environmental, Pharmaceutical, Industrial and Commercial industries in the United States and throughout the world.

As Executive Vice President of the IPMA over the last 20 years, he has designed, developed, and presented project related training sessions and is an internationally recognized training instructor.

Mr. Cabano earned his B.S. in Mechanical Engineering from Villanova University and is a member of AACE International, CII and Project Management Institute. He has also authored several articles for Chemical Processing, Chemical Engineering, Refinery Today and PMI.


Description
This seminar will cover Project Controls Industry “Best Practices” (approaches, methods, techniques and tools) suitable to an owner organization’s project portfolio and specific projects.  Topical coverage will include:

• Project Controls Perspective (relative to Owner’s role)
• Project Controls Process
• Roles and Responsibilities for Project Controls (Project Manager/Engineer, Owner’s Project Team, Owner's Project Controls Team/Representatives, Contractors)
• Planning and Scheduling (Development and Baselining)
• Cost Estimate/Budget (Development and Baselining)
• Cost and Risk Analysis and Contingency (Development and Management)
• Progress and Productivity Measurement
• Cost and Schedule Management
• Project Controls Reporting
• Change Management

A combination of material presentation in lecture format, examples and interactive sessions will be utilized by the instructor to provide attendees with an opportunity to engage in discussions and participate in an effective learning experience.

Who would most benefit by attending your seminar?
Owner Project Team Representatives, primarily Owner’s Project Manager’s, Project Controls Specialists and Managers, Project Engineers.

Content:  Basic

Key learning objectives:  
-Define the Role of Owner Representatives in Project Controls
-Understand the working relationship between Owners and Contractors with respect to Project Controls
-Define Project Controls "Best Practices" for Owner Organizations
-Define the Development and Utilization of Work Breakdown Structure
-Developing Project Cost and Schedule Baselines
-Define Effective Framework for Internal (Owner) and Contractor Project Controls Reporting
-Analyzing/Interpreting Project Reports/Data
-Outline and Effective Change Management Process/Guidelines
-Define and Effective Project Controls Environment for: Measuring Progress, Measuring Productivity, Measuring Earned Value, Forecasting/Trending Cost/Schedule

How learning objectives are measured:
An appraisal form and participant feedback form to quantitatively (10 point scale) and qualitatively measure the attendees' learning experience on a self-assessment basis (pre and post-seminar level of understanding of topical coverage) is used. 

Knowledge areas addressed:
Project Controls:
• Planning & Scheduling (Development, Baselining, Control)
• Cost Estimating/Budgeting (Development, Baselining, Control)
• Risk Analysis/Management, Contingency Setting & Management
• Change Management
• Project Reporting/Communication

TIME

DAY ONE

DAY TWO

DAY THREE

11:00 AM EDT

70 Minutes

Safety Moment

  • Introduction
  • Safety Moment
  • Learning Objectives
  • Participant Expectations
  • Participant Appraisal Form

1. Project Controls Perspective

2. Project Controls Process

Safety Moment

6. Cost Estimating

  • Cost Estimate Basis
  • Cost Estimate Classifications
  • Cost Estimating Methods and Estimate Accuracy
  • Cost Baseline
  • Checking/Reviewing Cost Estimates

Workshop #3 – Estimating

Safety Moment

Workshop #4 Feedback

9. Schedule Control

10. Cost Control

12:10 PM EDT

40 Minutes

LUNCH

LUNCH

LUNCH

12:50 PM EDT

70 Minutes

3. Roles and Responsibilities for Project Control

4. Scope Definition

Workshop #1 – Work Breakdown Structure

 

7. Cost Risk Analysis & Contingency Determination

8. Schedule Risk Analysis & Schedule Reserve (Time Contingency)

11. Progress and Productivity Measurement

12. Cost & Schedule Contingency Management

Workshop #5 – Progress/Productivity

2:00 PM EDT

15 minutes

BREAK

BREAK

BREAK

2:15 PM EDT

70 Minutes

5. Planning & Scheduling

  • Planning Versus Scheduling
  • Resources/Resource Loading
  • Float Management
  • Schedule Baseline
  • Schedule Reviews

Workshop #2 – Planning Workshop

Workshop #4 – Risk Analysis

13. Communications and Reporting

14. Change Management

Workshop #6 – What-If Scenarios

  • Session Close Out
  • Open Discussion
  • Participant Appraisal Form

3:25 PM EDT

 

CONCLUDE DAY ONE