Technical Program Schedule
(For detailed information about each session, refer to the Abstracts pages.)

Sunday (June 16)

NOTE: Program Subject to Change

Room 1 Room 2 Room 3 Room 4 Room 5 Room 6 Room 7 Room 8 Room 9
SUN 1:00-2:00 BIM-3072 TCM-3049 OWN-3056 EVM-3265 TCMA-3312 PS-3261 PS-3283 CDR-3178 PM-3259
  The Constructible Process – Moving Beyond BIM to Build with Confidence Sensitivity Analysis of Discount Rates for Life-Cycle Costing of Pavements Reference Class Forecasting: Theory and Practical Application Earned Value Challenges in Projects With Different Project and Functional Currencies (Panel Discussion) TCM Analytics Reporting Tool P6 Visualizer The Habits of Highly Effective Scheduling Overhead Costs in Delay and Productivity Claims Improving Project Success by Introducing Safety Measures Early in the Project Life Cycle
  Jon Fingland Dr. Robert L. Schmitt, PE; Dr. Samuel Owusu-Ababio, PE J. Michael Devine, CCP; Rob Adkison, PE CCP Petronella Anna Cronje, CCP EVP Dr. Manjula Dissanayake, CCP Marina G. Sominsky, PSP Sylvia M. Donado Christi Fu, PE Chantale Germain, P.Eng.; Dr. Nathalie Drouin
  Intermediate Intermediate Intermediate     Advanced Basic    
  Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD
SUN 2:15-3:15 BIM-3142 TCM-3106 OWN-3222 EVM-3161 PS-3243 PS-3082 CSC-3253 CDR-3147 PM-3051
  Building Information Modeling as Collaborative Working Mechanism on Construction Projects Accurate Quantity Update: A Key for Project Management Success Progress Measurement for Owners EVM Application: Quantifying Values in Various Industries and Project Phases Which Schedule Quality Assessment Metrics to Use? …and When? Float Consumption and Resiliency Theory Put into Practice  A 3-Dimensional Project Controls Breakdown Structure for the Planning and Scheduling of PETRONAS FLNG1 Project A New Role for Project Control Professionals on Dispute Boards Challenges for Cost Control in Operations in Peruvian Small Companies of Construction
  Charles U. Ufua Huimin Shi, CCP PSP Ferdinand R. Karbowski, Jr. PSP Pranab Kumar Deb, P.Eng. PSP; Jatin Jajal, P.Eng. CCP CEP EVP Shoshanna Fraizinger, CCP Greg M. Hall, PSP Suraini Bin Husin  James G. Zack, Jr. CFCC FAACE Hon. Life Gloria Luz Flores Fernandez
    Intermediate Advanced     Intermediate Basic   Basic
  Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD
SUN 3:15-3:45 Coffee Break (Exhibit Hall)
SUN 4:00-5:00 BIM-3097 TCM-3301 OWN-3241 CSC-3156 PS-3149 CSC-3199 RISK-3055 CDR-3145 PM-3121
  Application of BIM in Earned Value Management for Large-Scale Complex Construction Projects (Workshop) A Practical Guide to Project Controls Development - Part 1 of 3 Commissioning Oil and Gas Facilities: A Practical Owner’s Perspective Integrated Project Control System Based on EVM Methodologies: A Case History (Panel Discussion) The Scheduling Truth or Lie Game - Fellows Edition (Presentation Only) MS100 Modular Reporting Framework Holistic Risk Management Perfecting the Fixed Perspective Windows Delay Analysis WYSIATI “What You See Is All There Is”: How Are Capital Projects Delivered?
  Xuejiao Liu; Chunfu Xu; Liqiu Kang Dave Kyle, CCP CEP Dennis H. Sundgaard, P.Eng.; Dr. George F. Jergeas, P.Eng. Massimoluigi Casinelli, CCP Christopher W. Carson, CEP DRMP PSP FAACE; Julie K. Owen, CCP PSP FAACE; Sean T. Regan, CCP CEP EVP PSP FAACE; James G. Zack, Jr. CFCC FAACE Hon. Life; Richard Selg, CCP FAACE; Neil D. Opfer, CCP CEP PSP FAACE Aditya Arya, PSP Eric Ho John Jackson Dr. Diana Nada
  Intermediate   Intermediate Basic     Basic    
  Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD Host: TBD
SUN 5:15-6:45 Opening Reception (Exhibit Hall)